Higleig Petroleum Services and Investment Co. Ltd is a private national company established in 1997 to meet the petroleum era. Higleig Petroleum Services commenced its activities in the fields of engineering, procurement and construction with an eye on the future, which comprised the onset of a new century and the new millennium.

 

The Founders of the Company who are themselves working in the fields of construction, general contracting and trade have their objective to build a capable national company based on international standards to support the flourishing oil industry in Sudan.

To meet the ever-increasing demands of the nation's engineering industries, HPSIC's is constantly upgrading its technical know-how by different levels of training to its staff both inside and outside the country.

Forming Joint Ventures with and working as sub-contractors for renowned foreign companies to transfer foreign technology into the country is just one of many factors which show as a sign of HPSIC's capability. With the dedication, persistence of its people, the confidence and credibility it gained through its practice, and with the initiating challenging spirit of its management, HPSIC is undoubtedly more than qualified to meet the challenges of the new century and the new millennium.

 



Business Activities

  • General Contracting
  • Engineering Activities
  • Commission Agents
  • Consulting and Turn-key jobs
  • Design & Construction of Roads, Bridges, Water channels etc.
Share Holders/Stock Market

Partners:

  1. Danfodio Commercial and Contracting Foundation
  2. El-Nasr Construction and Housing Company
  3. Red Sea Shipping and Services Co.Ltd
  4. The Advanced Engineering Work Company
  5. The Sudanese Piling Co. Ltd.
  6. El-Shahed Construction Co. Ltd
  7. Sudanco Investment Co.Ltd
  8. Handi International Trade Co.
  9. Taj Brothers Co.Ltd
  10. National Trade and Services Co.Ltd
  11. Khartoum Commercial and Shipping Co.Ltd
  12. Hysen International Trade Co.
  13. Mohamed A/Al-Gadir A/Alim

More than 300 earth moving equipment used for:

  • Earth Works
  • Civil Construction
  • Road Construction
  • Trenching
  • Equipment Rental

 

 

The following projects are arranged in chronological order beginnning with the most recent

Marawe Dam & Karema Dam Roads

Project Client:  Marawe Dam
Description: The work involves the construction of two roads. A 42 Km. road from Marawe to the dam location and a 27 Km road from Karema to the dam location.
Location: Marawe
Contract Value: $5,520,000 USD
Date of Completion:
In progress

Jarayan Lehr Road

Project Client: Lundin - Sudan
Description: The works included the construction of all season's road. The total length of the road is 47km. All tasks were carried out by HPSIC including survey works, earth works, and drainage structures. Our site laboratory carried out all required tests.
Location: Unity State
Contract Value: $3,744,000 USD
Date of Completion: In progress

Elrenk – Fuluge Road

Project Client:
Petrodar Operating Company
Description: The works included the construction of all season's road. The total length of the road is 160km. All tasks were carried out by HPSIC including the survey works, earth works, R.c.c Bridges, and drainage structures. Our site laboratory carried out all required tests.
Location: Upper Nile State
Contract Value: $17,619,022 USD
Date of Completion: June 2002

33 kv Distribution System


Project Client:
Greater Nile Petroleum Operating Company
Description: It is a high voltage distribution system that includes procurements of all materials, electrical cables laying and executing all internal electrical connections.
Location: Unity & Western – Kordofan
Contract Value: US$ 6,500,000
Date of Completion: June 2002

Munga Field Development & pipe line

Project Client: Greater Nile Petroleum Operating Co. Ltd.
Description: This is an EPC Project executed in collaboration with Petrofac International. HPSIC was involved in the construction of pipe lines, flow lines, piping, processing facilities, all associates civil works, electrical, and instrumentation works. Expected production of this field is 20.000 barrels per day.
Location: Unity State
Contract Value: $25,000,000 USD
Date of Completion: May 2002

Produced water Bioremediation Project

Project Client: Greater Nile Petroleum Operating Co. Ltd.
Description: The project is aimed for treating water produced from oil exploration. The project includes excavation, embankments, pump station, and irrigation works.
Location: Hijleig Area
Contract Value: $4,500,000 USD
Date of Completion:  March 2002

Doka Gallabat Road

Project Client: National highway Authority
Description: This project is part of The Pan-African International Highway extending from Cape Town in South to Alexandria in the north and from Mombassa in the East to Dakar in the west. Due to the good performance of HPSIC in this part, the client awarded the rehabilitation of the first part from Gadaref to Doka.
Location: Gadaref State
Contract Value: $13,550,000
Date of Completion: December 2001

Rubkona Tharjath Road

Project Client: International Petroleum Corporation
Description: The works included the construction of all season's road. The total length of the road is 73km. All tasks were carried out by HPSIC including survey works, earth works, and drainage structures. Our site laboratory carried out all required tests. This road is the key for the development of Block 5 (Oil Field).
Location: Unity State
Contract Value: US$ 5,300,000
Date of Completion: January 2001

Erecting Telecom

Project Client: Techint-Sapiem
Location: Hijleig, Dilling, Obeid
Contract Value:
$1,450,000 USD
Date of Completion:
September 1999

Field Surface Facilities 2

Project Client: China Petroleum Engineering Construction Corporation.
Description: HPSIC carried out the civil works, and piles electrical works, e.g. Driving of pipe (2400). Clearance of right of way (70 km), excavations (90000 m3),backfilling (120000 m3), R.C Foundation for pipe supports, transformers & drain pits ( 700 m3) & fencing of oil wells (2500 m). The electrical works included the erection of L.V. switchgear cabins.
Location: Hijleig Area
Contract Value: $3,000,000 USD
Date of Completion: July 1999

Engineering Procurement & Construction

Project Client: China Petroleum Engineering Construction Corporation.
Description: HPSIC carried out the civil works which included earth pads, access roads, bases for oil storage tanks, drainage facilities in station yards, utility bond e.g., firewater bond ,and evaporation Bond. The works also included steel Piling for power. transmission Towers, other oil structures and residential facilities.
Location: Muglad Basin Area
Contract Value: $10,000,000 USD (United States Dollars)
Date of Completion: June 1999